The 2025 Stakeholder Insights Event recordings are now available to watch.
Saibai Island, TSIRC › Climate Change Adaptation › 5.1 seawall › Reply To: 5.1 seawall
Hello
Could we also request the outside diameter(s) at the discharge point of the pipes? If not nominal bore and wall thickness will also be suitable