Project for 1.5

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #9992
    Micaela Ghosen
    Participant

      Which project for the Lama Lama group should we choose for design area 1: infrastructure and access, focus area 1.5 Materials and Construction Approaches for Remote Settings?

      What does this area of EWB actually mean?

    Viewing 1 post (of 1 total)
    • You must be logged in to reply to this topic.